Auckland Construction Projects Underway
Ultralon® is proud to be involved with a large number of differing projects across the Auckland region.
Mission Homeground Apartments - Hobson Street, Auckland - 16 Storey Building
Auckland City Mission has started development work on the site of their longstanding Hobson Street premises, with plans to create a ground breaking community facility to assist in solving chronic homelessness in Auckland and due for completion mid-2021.
Thermobreak® 9705 Pipe Insulation & Thermobreak® 25C Insulation under installation on the plumbing & waste pipework. (DL Good Plumbing)

Franklin Private Hospital – Pukekohe
This new 2 story private hospital is currently under construction and due to be completed October 2021.
Thermobreak® 9705, Thermobreak® No-Clad and Thermaloc pipe support blocks will be installed on the mechanical services pipework. – Axis Plumbing Ltd
Thermobreak® 9705 pipe insulation along with Thermobreak® 25C acoustic pipe wrap used on the plumbing& waste pipework. ECL Group Plumbing

Auckland University of Technology (Student Accommodation)
Located in Auckland CBD, on the corner of Mayoral Drive and Wakefield Street, This Mixed Use Development contains 641 self-catered student apartments across two towers. North & South Towers will house 12 levels of student accommodation each, with ground floor dedicated to retail, hospitality and student amenities due for completion early 2021.
Thermobreak® 9705 & Thermobreak® & Thermaloc Pipe installed on the mechanical pipe services (AE Smith Ltd) along with Thermobreak® 9705 & Thermobreak® 25C Acoustic Pipe wrap on the plumbing & waste pipework (DL Good Plumbing)

136 Fanshawe Street – 8 Story Office building - Class Above The Rest - New Development
A prime development of 19840sqm by prominent developer Mansons TCLM set to be complete by Q3 2021. This building has been designed to a 6 Star Greenstar rating with a seismic rating of 100 %NBS.
Thermobreak® 9705, Thermobreak® No-Clad and Thermaloc pipe supports are the preference on the mechanical services pipe work. (Axis Plumbing)

Hilton Foods Group (Meat Processing plant)
Countdown's 142 North Island supermarkets are to be supplied from mid 2020 by a $100 million state of the art meat processing factory to be built at Wiri, south Auckland.
It's the first development in New Zealand for big Australian developer, Logos, which bought a 10-hectare industrial parcel of land at Wiri in July 2018 for an industrial park.
Thermobreak® 9705 pipe insulation along with Thermaloc pipe support blocks have been installed on the mechanical pipe work along with Thermobreak® No-Clad pipe insulation on the pipework in the plantroom area.
Thermobreak® 9705 pipe insulation & Thermaloc pipe support blocks have also been supplied for the plumbing pipe insulation. (Axis Plumbing / Ross Insulation Ltd)

Ultralon® Foam International, the NZ distributors of Thermobreak® insulation products, are excited that we have won the contract to supply the HVAC and Hydraulic (plumbing) for this exciting new build.
Thermobreak® is the leading and most innovative polyolefin foam thermal insulation available to the HVAC and Building industry worldwide. Thermobreak’s® performance is unsurpassed.
- Technically superior – very low thermal conductivity & negligible water vapour permeance
- Third party certified & tested
- Energy efficient
- Quality materials engineered to last
- Compliant to major fire, smoke and performance standards
- Proven reliability for over 30 years
- Fast and efficient to install and easy to cut with conventional equipment